Prefabricated Building

2018 06/23

With the development of modern industrial technology, houses can be built in batches, just like machines.As long as the prefabricated building components, shipped to the site to be assembled.

28114818970

A large number of building parts are produced and processed by the workshop, and the components are mainly: exterior wall panels, interior wall panels, laminated boards, balconies, air-conditioning boards, stairs, precast beams, precast columns, etc.

1511142479(1)

It needs oblate pre-stressed metal corrugated pipe, circular pre-stressed metal sewage pipe or circular pre-stressed plastic corrugated pipe/tube. Those ducts should be prepared before structure form work and concreting.

IMG_0619

It adopts the integrated design and construction of architecture and decoration, and the ideal state is that decoration can be carried out synchronously with the main construction.

mmexport1481273701977

The standardization of design and management of information, the standard components, the production efficiency is higher, the corresponding component costs will fall, cooperate with the digital management of the factory, the prefabricated construction will be more and more affordable.